Solar Roof Top (SRT) System
Increasing cost of Electricity makes today the best time to invest in Solar Rooftop Systems. Be an Independent Power Producer, not only does a system pay itself off via Government Subsidies and Lower or No Electricity Bills, your investment in our Solar Systems further attracts Tax Benefits for a commercial establishment.
A standard KW Solar Rooftop System installation is affordable for almost anyone to get started on a Greener, Cleaner and Cheaper way forward. Installing a Solar Power KW system will instantly add to the value of your Residential or Commercial Establishment. Your most Profitable investment ever !
A Solar Roof Top System is a PV System tied-up with the Grid. It uses roof-mounted or building-integrated Solar Panels to collect energy from the Sun and Convert it into usable electricity. A System installed on a grid-connected house or building can supply a portion of the power needed to run the Site. During the day electricity generated by the Solar Power System is fed into the building, offsetting the amount of power being drawn from the grid. Any excess power is fed back to the power utility to be used by someone else resulting in a Power Credit.
Solar Roof Top System Benefits
For Registration or Installation of Solar Roof Top Power Generation Plant, please fill out the Registration Form.
Increasing cost of Electricity makes today the best time to invest in Solar Rooftop Systems. Be an Independent Power Producer, not only does a system pay itself off via Government Subsidies and Lower or No Electricity Bills, your investment in our Solar Systems further attracts Tax Benefits for a commercial establishment.
A standard KW Solar Rooftop System installation is affordable for almost anyone to get started on a Greener, Cleaner and Cheaper way forward. Installing a Solar Power KW system will instantly add to the value of your Residential or Commercial Establishment. Your most Profitable investment ever !
A Solar Roof Top System is a PV System tied-up with the Grid. It uses roof-mounted or building-integrated Solar Panels to collect energy from the Sun and Convert it into usable electricity. A System installed on a grid-connected house or building can supply a portion of the power needed to run the Site. During the day electricity generated by the Solar Power System is fed into the building, offsetting the amount of power being drawn from the grid. Any excess power is fed back to the power utility to be used by someone else resulting in a Power Credit.
Solar Roof Top System Benefits
- Lowest MRP in history.
- MNRE Subsidy is 30% on MRP.
- GEDA Subsidy is Rs. 10,000 for 1KW and Rs. 20,000 for 2KW or more.
- Excess Load pushed into local Discom resulting in a Power Credit.
- 5 Years Guaranty.
- 25 Years of Panel Performance Warranty (First 10 Years >= 90%, Next 15 Years >= 80%)
- Get Depreciation Benefit.
- Assured Daily Reliable and Stable Power Generation.
- Hybrid Solar System - works on both Solar Power and Grid Power supplied by Torrent or any other Power Supply Body.
- Intelligent Inverter - Automatically manages power from Solar, Battery and Grid.
- Inbuilt Protection against Voltage Fluctuations, Overload, Battery over charge/discharge etc.
- Easy Installation and Minimal or Zero Maintenance
- VAT, Transportation, Installation - Covered in the cost, which means you don't have to pay for anything. Just Install SRT System and enjoy the benefit of it.
For Registration or Installation of Solar Roof Top Power Generation Plant, please fill out the Registration Form.
Sr | Description | 1 KW | 2 KW | 3 KW | 4 KW | 5 KW | 6 KW | 7 KW | 8 KW | 9 KW | 10 KW |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | MRP | 69,000 | 1,38,000 | 2,07,000 | 2,76,000 | 3,45,000 | 4,14,000 | 4,83,000 | 5,52,000 | 6,21,000 | 6,90,000 |
2 | MNRE Subsidy (Less) | 20,700 | 41,400 | 62,100 | 82,800 | 1,03,500 | 1,24,200 | 1,44,900 | 1,65,600 | 1,86,300 | 2,07,000 |
3 | GEDA Subsidy (Less) | 10,000 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 |
4 | Net SRT Cost | 38,300 | 76,600 | 1,24,900 | 1,73,200 | 2,21,500 | 2,69,800 | 3,18,100 | 3,66,400 | 4,14,700 | 4,63,000 |
5 | Discom Rate | Rs. 7.08 (5/- Residential Unit Rate + 1.3/- FPPPA Charges + 0.75/- Govt. Duty 15% on Unit Rate | |||||||||
6 | Space (Sq.Ft.) | 90 | 180 | 270 | 360 | 450 | 540 | 630 | 720 | 810 | 900 |
7 | Yearly Output (KW) | 1,600 | 3,200 | 4,800 | 6,400 | 8,000 | 9,600 | 11,200 | 12,800 | 14,400 | 16,000 |
8 | Yearly Savings | 11,280 | 22,560 | 33,840 | 45,120 | 56,400 | 67,200 | 78,400 | 89,600 | 1,00,800 | 1,12,000 |
9 | Payback (Year) | 3.42 | 3.42 | 3.72 | 3.87 | 3.96 | 4.01 | 4.06 | 4.09 | 4.11 | 4.13 |
Subsidy Documents | |||||||||||
1 | Rs. 1150/- DD/Cheque in favor of Gujarat Energy Development Agency Payable at Gandhinagar. | ||||||||||
2 | Application Form with Customer Sign & Last Electricity Bill - 2 Copy | ||||||||||
3 | Passport Size Color Photos - 3 Copy | ||||||||||
4 | PAN Card/Aadhar Card/Election Card/Driving License/Passport - 2 Copy | ||||||||||
5 | Purchase Deed/ Index-2/ HouseTax Receipt/ Property Card OR Rent Agreement - 2 Copy | ||||||||||
6 | Society NOC/ BU Certificate - incase of Multifloor/Flat Residential Property - 2 Copy | ||||||||||
Subsidy Process | |||||||||||
1 | Customer Identification & Site Survey. | ||||||||||
2 | Collect SRT Application, Documents and GEDA Registration Fees from Customer. | ||||||||||
3 | Company will Verify the Documents & Forward the Project Application to GEDA. | ||||||||||
4 | GEDA will send Sanction Letter to Customer, Discom and Chief Electrical Inspector. | ||||||||||
5 | Collect the Sanction Letter copy & 100% Payment from Customer. | ||||||||||
6 | Discom will Intimate the Company for the Net Metering Formalities. | ||||||||||
7 | SRT Material Delivery, Erection, Installation & Commissioning by the Company. | ||||||||||
8 | Inspection from Govt. Approved Contractor and Collect the Approval/Test Report. | ||||||||||
9 | Intimation of the Chief Electrical Inspector and Collect Completion Certificate. | ||||||||||
10 | Submit the Completion Certificate to Discom for installation of the NetMetering. | ||||||||||
11 | Handover the SRT System to Customer with Operation and Instruction Manuals. |